
How production is assigned
We match board type, stack-up, material, process, volume and qualifications to the factory for the project. Prototype and production limits are reviewed separately. Qualification and inspection records are checked against the actual site and order scope.
Coordinating your project files
For PCB fabrication, send the stack-up, impedance table, drill charts and fabrication drawing from the same revision. For laminate supply, specify the grade, construction and quantity. Assembly and system integration have their own materials, test and acceptance requirements.
What we confirm for your project
Engineering review
We consolidate open questions about your files, stack-up, materials and assembly requirements before quotation.
Production and test scope
We confirm fabrication, assembly and the inspection methods required for the order.
Prototype to production
We keep the approved design revision and agreed changes with the order through production and delivery.
Project coordination and production
Shenzhen branch office
Customer communication, engineering intake and project coordination.
Meizhou partner production site
Our Shenzhen team coordinates PCB production with the Meizhou partner site and other factories selected for the build. Production scope and qualifications are confirmed for the assigned site.
Learn morePCB MaterialsHigh-Performance PCB Materials
Confirm laminate grade, construction, foil and availability against your stack-up.
Learn moreCompany FAQs
Where are orders manufactured?
Each order is allocated to a qualified facility in the ShinePCB manufacturing network. The assigned facility is identified in formal project documents.
How is the production partner selected?
Our Shenzhen team matches the process, materials and qualifications required for the project. The quotation identifies the agreed production scope and applicable documentation.
How do I start a project?
Use Request a quote or email our sales and engineering team. We review your requirements before any quotation.


