Resolve sourcing for the first build
List manufacturer part numbers, quantities and consigned components. Flag long-lead and obsolete items, and approve any alternative before the prototype configuration is set.
Define what a passing board does
Provide firmware, power conditions, connections and expected outputs. If fit, cabling or product operation is part of the acceptance scope, include the enclosure and integration requirements.
- Assembly feedback
- Component availability and substitutions
- Consigned and sourced parts
- Path to production
PCBA project support
- Engineering DFM / DFA
- Free review before quotation
- Turnkey scope
- BOM review, sourcing, PCB, assembly, testing and documentation
Assembly scope, test requirements and schedule are confirmed after file and BOM review.
Typical applications
Engineering validation builds
Pilot runs
Demonstration units
Prototype routes by what you need to validate
What to send
Files for an assembly review
- BOM with manufacturer part numbers
- Placement (centroid) file
- Assembly drawing and polarity notes
- Gerber data including paste layers
- Test or programming instructions, if any
Start a project
Send your files and planned quantities. We will confirm the open engineering points before quoting.
Prototype PCBA FAQs
Can prototypes use consigned parts?
Yes. We confirm which parts you supply and which we source.
Will you flag design issues?
Assembly feedback is shared before the build.