EMS · Assembly

BOM and Component Sourcing

Define manufacturer part numbers, consigned items, approved channels and traceability by BOM line.

BOM procurement
Material warehouse

Build a purchasing list from the BOM

List each MPN, reference designator, quantity and sourcing responsibility. Mark nominated suppliers and parts that need approval before substitution. Give sample and production quantities separately.

Decide what to do about constrained parts

Flag obsolete or hard-to-find devices. Review proposed alternatives for package fit, electrical ratings and function before buying. Specify lot traceability, moisture controls or extra authentication where required.

  • BOM completeness and part numbers
  • Availability and alternatives
  • Customer-designated sources
  • Consigned part split

Component sourcing and BOM control

ItemStandard processAdvanced / non-standard
Component sourcingAuthorized distributorsCustomer-designated sources
Component typesResistors, capacitors, inductors, ICsFPGA, ASIC, RF devices
Package support0201, QFP, SOP, SOIC01005, CSP, BGA, LGA
Obsolete componentsActive production partsEOL / hard-to-find components
Alternative componentsCustomer approvedCross-reference and replacement analysis
BOM verificationQuantity check, MPN checkFull DFM and DFA review
Component traceabilityBatch trackingFull lot-level traceability
Moisture-sensitive devicesMSL 1–3MSL 4–6 with dry cabinet control
Counterfeit preventionVisual verificationX-ray inspection, decapsulation, third-party authentication

Substitutions are used only with customer approval.

Typical applications

Prototype and production PCBA

Box build projects

Repeat orders

What to send

Files for an assembly review

  • BOM with manufacturer part numbers
  • Placement (centroid) file
  • Assembly drawing and polarity notes
  • Gerber data including paste layers
  • Test or programming instructions, if any

Start a project

Send your files and planned quantities. We will confirm the open engineering points before quoting.

Component Sourcing FAQs

Do you use substitutes?

Only with your approval.

Can I specify the supplier?

Customer-designated sources are available on request.

Send your PCB and material requirements

  • Review of product, sourcing and production requirements before quotation
  • Separate quantities and requirements for prototype and production
  • Inspection, documents and delivery agreed for the order