PCB Manufacturing · Standard & Advanced PCB

PCB Prototypes and Quick-Turn Fabrication

Prototype bare boards to check fit, impedance or the proposed via structure. Provide quantities and target dates for the prototype and anticipated production run.

Prototype → production
Prototype development board

Make the first build answer a specific question

For fit, provide outlines, mounting holes and tolerances. For impedance, include targets, reference layers and the required report. For blind and buried vias, identify each drill span.

Track changes before the series build

The published minimum rigid trace and space are 2.5 mil each for prototypes and 3 mil each for production. If materials or the stack-up change between stages, specify what you need to verify again.

  • Design feedback before the build
  • Material and process choices that carry into production
  • Quantity and schedule
  • Changes between prototype revisions

Prototype versus mass-production limits

The same parameter often has a different limit at prototype and at production level. Plan production on the right-hand column.

ParameterPrototypeMass production
Rigid — Layer count (max)50L36L
Rigid — Min trace / space2.5 / 2.5 mil3 / 3 mil
Rigid — Min through-hole diameter0.075 mm0.10 mm
Rigid — HDI level9th order5th order
Rigid — Impedance control tolerance±5%±7%
Rigid-flex — Layer count (max)20L18L
High-frequency — Layer count (max)24L20L

Prototype and mass-production values are listed separately and are not interchangeable. Every value is confirmed against your files, the selected material and the assigned facility during engineering review.

Prototype engineering support

Engineering DFM
Free review before quotation
Prototype planning
Process, material and test plan reviewed per design
Production transition
Production capability reviewed separately from prototype limits

Prototype scope and schedule are confirmed after engineering review of the project files.

Typical applications

New product introduction

Design verification builds

Engineering samples

Prototype routes by what you need to validate

What to send for a PCB review

Start with the details you have — engineering will request anything else needed for the review.

Files and details for a PCB review

  • Gerber (RS-274X) or ODB++ data with drill files
  • Fabrication drawing with material, thickness and finish
  • Stack-up and impedance targets, if any
  • Quantity for prototype and for production
  • Special requirements such as IPC class, testing or packaging

Technical files stay private

Gerber files, BOMs and drawings are handled privately and shared within your project.

Prototype & Quick-Turn FAQs

How fast can you build prototypes?

Schedules depend on the design and are confirmed in the quotation.

Will the production build match the prototype?

We review production requirements separately and flag any differences before the production order is confirmed.

Send your PCB and material requirements

  • Review of product, sourcing and production requirements before quotation
  • Separate quantities and requirements for prototype and production
  • Inspection, documents and delivery agreed for the order