Separate the fit check from the functional test
For a fit check, identify mounting points, openings and harness routing. For functional testing, provide firmware, power, operating steps and pass criteria.
Record the changes required for production
Send the assembly model, BOM, enclosure and harness drawings. Record temporary materials or processes so the final release can be reviewed against the tested prototype.
- Combined electronic and mechanical scope
- Design feedback
- Materials and processes
- Schedule
Typical applications
Proof-of-concept devices
Investor and customer demos
Pre-production samples
Prototype routes by what you need to validate
What to send
Files for a mechanical review
- 3D model (STEP or IGES)
- 2D drawing with tolerances and finish
- Material and quantity
- Threads, inserts and hardware
- Inspection or certificate requirements
Start a project
Send your files and planned quantities. We will confirm the open engineering points before quoting.
Rapid Prototyping FAQs
Can one project include PCB and mechanical parts?
Yes. The combined scope is reviewed together.
How is the schedule set?
The schedule is confirmed in the quotation.