Materials

PCB Laminate Families and Selection Requirements

Compare FR-4, high-Tg, low-loss and RF laminates by layer, available thickness, copper and allowed substitutions.

Shengyi · ITEQ · TUC · Nan YaRogers · Isola · PanasonicTaconic · Arlon · Ventec

Choose the family by operating requirements

Review FR-4 and reflow requirements for rigid multilayers. For high-speed or RF layers, provide your loss budget and operating frequency. Compare individual grades under matching test conditions.

Assign each material to the stack and purchase scope

Specify layer positions, grades, thickness and hybrid interfaces. For a substitution, revisit impedance, thermal requirements and the tests affected by the change.

Manufacturer reference values by frequency

MaterialFrequencyDkDf
Isola I-Tera MT402 GHz3.450.0031
Isola I-Tera MT405 GHz3.450.0031
Isola I-Tera MT4010 GHz3.450.0031
Isola I-Tera MT40 RF/MW10 GHz3.380.0028
Isola I-Tera MT40 RF/MW10 GHz3.450.0031
Isola I-Tera MT40 RF/MW10 GHz3.60.0035
Isola I-Tera MT40 RF/MW10 GHz3.750.0035
Isola Tachyon 100G2 GHz3.040.0021
Isola Tachyon 100G10 GHz3.020.0021

Each row links to the manufacturer's data. Check the specific construction and test method before using these reference values in a stack-up.

Qualified material brands by board type

Board typeMaterial brands
Rigid PCBShengyi, Taiwan Union, ITEQ, Nan Ya, Rogers, Panasonic, Isola (Tg135 / Tg150 / Tg170, CAF / CTI>600, halogen-free)
Rigid-flex PCBShengyi, Ventec, Taiwan Union, ITEQ, Panasonic, Rogers, Isola, Arlon
High-frequency & high-speed PCBShengyi, ITEQ, Taiwan Union, Panasonic (M4/M6/M7/M8), Rogers, Taconic, Wangling, Ventec, Isola
FPCPI base and coverlay, LCP; FR-4, PI and stainless-steel stiffeners

Need help choosing?

Share these targets for a material review

  • Frequency or data rate
  • Dielectric constant and loss targets
  • Operating and assembly temperatures
  • Finished thickness and copper weights
  • Environment (humidity, CAF, halogen-free)
  • Cost target and volumes

Material selection

Engineering returns candidate materials, trade-off notes and availability questions before quotation.

Start your OEM or EMS project

  • Review of product, sourcing and production requirements before quotation
  • Separate quantities and requirements for prototype and production
  • Inspection, documents and delivery agreed for the order