
Set the released build baseline
Record approved substitutions, open pilot issues and acceptance requirements. Review differences between prototype materials and the production configuration and define any additional verification.
Check changes before a repeat build
Reconfirm supply, quantities and traceability. Document drawing revisions and approved replacements for obsolete components so the new order can be compared with the previous one.
- Production specification
- Change control
- Packaging and labeling
- Delivery plan
Mass-production capability highlights
| Parameter | Prototype | Mass production |
|---|---|---|
| Rigid — Layer count (max) | 50L | 36L |
| Rigid — HDI level | 9th order | 5th order |
| Rigid — Min trace / space | 2.5 / 2.5 mil | 3 / 3 mil |
| Rigid — Impedance control tolerance | ±5% | ±7% |
Prototype and mass-production values are listed separately and are not interchangeable. Every value is confirmed against your files, the selected material and the assigned facility during engineering review.
Typical applications
Series production
Repeat orders
Scheduled deliveries
Volume Production FAQs
How are changes handled?
Change control is agreed with you before production.
Can deliveries be scheduled?
Delivery plans are confirmed per order.


