Industrial Support

Engineering and Project Support

Review PCB fabrication files, stack-up and impedance before production. Confirm sourcing, assembly and inspection requirements for the parts of the project that need them.

EngineeringProcurementQuality

Start with the issue that could hold up release

For fabrication, check the stack-up against the drill and impedance files. For assembly, reconcile reference designators, orientations and the BOM. For a finished unit, match the enclosure and wiring against the assembly drawing.

Resolve substitutions before buying

Flag nominated suppliers, consigned components and part numbers that require approval. A laminate substitution can affect dielectric thickness and impedance. A component substitution can affect package fit or function.

Specify records by delivery scope

A bare board may need continuity or impedance records. An assembled board may need evidence from AOI, X-ray or functional tests. A finished unit needs an acceptance procedure against the product specification.

Send your PCB and material requirements

  • Review of product, sourcing and production requirements before quotation
  • Separate quantities and requirements for prototype and production
  • Inspection, documents and delivery agreed for the order